CRITICAL PATH CONSTRUCTION LLC
Last verified against DBPR public records: February 2026
Florida State License DBPR Verified
DBPR Public Record Florida Statute 119
Public Record Score
Weak Public Record
Minimal online presence. License on file but few other signals.
Weak TierContact
Service Area
About General Contractors in Florida
General contractors in Florida are strictly required to hold an active CGC (Certified General Contractor) or CRC (Certified Residential Contractor) license issued by the Department of Business and Professional Regulation (DBPR) under Florida Statutes Chapter 489. A CGC license authorizes work on any structure — commercial, residential, or industrial — without limitation. CRC licensees are limited to residential projects of 3 stories or fewer.
General contractors in Riviera Beach coordinate all phases of construction including permitting, scheduling subcontractors, materials procurement, and code compliance inspections. All work must meet the Florida Building Code — one of the most stringent in the nation due to hurricane and flood requirements.
The Associated General Contractors of Florida (AGC) and the National Association of Home Builders (NAHB) set professional standards for the industry. Florida law requires general contractors to carry liability insurance, workers' compensation coverage, and maintain a surety bond or cash deposit.
Please verify your contractor's license before hiring. Search any Florida contractor license at myfloridalicense.com or use Call Charlie's instant verification. The FTC's guide to hiring a contractor is a helpful resource for homeowners.
Verified by Florida DBPR
CRITICAL PATH CONSTRUCTION LLC — License #CGC1519159. Public record. State verified. Need to reach them?
Other Licensed General Contractors in Riviera Beach
Is This Your Public Record?
This profile was compiled from DBPR public records and verified against the state database. If you are the license holder, update your record to ensure consumers in Riviera Beach have your most accurate contact information and credentials.
Update Public Record